CHAPTER ONE
INTRODUCTION
STATEMENT OF PROBLEM
A scheduling situation in a transport company develops when buses are expected to dispatch effectively. Scheduling needs the dispatch and general information about routes to generate optimal transportation resources schedules. Lack of management and scheduling modules have cause a big problem for most transport companies. As a result of these problems, these transport companies have not been able to present charts and text reports for these companies.
These transport companies can not export solutions as text files in MS Word or MS Excel.
Lack of scheduling algorithms have led to lack of generating of the different resources schedules.
Lack of near-optimal resources schedules generation have prevented benchmarking an existing solution. Existing routes along with resources assignments can not be imported into the system “as is’ and calculate to reproduce the benchmark solution. The solution can not be generated and compared to the benchmark solution. The two solutions cannot be compared in the form of reports and Grantt Charts to identify opportunities for better resources utilizations.
Route data can not be imported in the form of ASCLL files.
There is no data import wizard that will guide user’s through a set up process for importing route data into the system. Lack of data view to enable user’s to sort the routes based on different criteria (route ID) Departure Time etc).
PURPOSE OF THE STUDY
This research work is meat to find out whether the above mentioned problems can effectively be eradicated by employing computer system to control the scheduling system of a transport company. In other words, to find solution to these problems mentioned above using a computer system.
AIMS AND OBJECTIVES
The aim and objective of this research work is to come up with a more suitable scheduling system in a transport company. (A computer based scheduling system) that can eliminate completely the above mentioned problems using a computer system. For instance, to come up with a scheduling system that can generate optimal buses and driver schedules for a given dispatching scenario.
Perhaps, the new system will not just eradicate the problems which will automatically improve the schedules.
SCOPE OF THE STUDY
This project work covers every area of scheduling activities where a scheduling tool generates optimal buses and drives schedules for a given dispatching scenario.
For instance, this tool provides an estimate of required number of buses and drivers for a particular dispatching scenario. It also generates resource scheduling that can result in significant cost reduction by using the optimal number of resources required.
Abstract
Understanding the distinction between impressions and ideas that Hume draws in the opening paragraph of his &q...
ABSTRACT
This project work is to evaluate human trafficking among our youth in the society (a case study of Oredo Local...
ABSTRACT
In educational situation, success is measured by academic performance or how well a student me...
Abstract
Strike defined by the Webster’s dictionary as an organization refusal to work by employees of an organization e.t.c becaus...
ABSTRACT
Online examination systems are being used by an ever-increasing number of institutions to help...
ABSTRACT
This study was carried out to examine the land availability challenges and mismanagement ...
ABSTRACT
This study was conducted to identify the strategies to improve Delta State Technical colleges students skills and academic perfo...
BACKGROUND TO THE STUDY
The origin of mass education in the north started in the late 1940s to early 19...
ABSTRACT: Exploring the benefits of mindfulness-based practices in e...
ABSTRACT
The Nigerian financial system experienced series of reforms and amidst these reforms an important compon...